Holooly Plus Logo

Question 16.2: Transfer Line Performance A machine tool builder submits a p...

Transfer Line Performance
A machine tool builder submits a proposal for a 20-station transfer line to machine a certain component currently produced by conventional methods.
The proposal states that the line will operate at a production rate of 50 pc/hr at 100% efficiency. On similar transfer lines, the probability of station breakdowns per cycle is equal for all stations: p = 0.005 breakdowns/cycle. It is also estimated that the average downtime per line stop will be 8.0 min. The starting casting that is to be machined on the line costs $3.00 per part. The line operates at a cost of $75.00/hr. The 20 cutting tools (one tool per station) last for 50 parts each, and average cost per tool is $2.00 per cutting edge. Determine (a) production rate, (b) line efficiency, and (c) cost per piece produced on the line.

The "Step-by-Step Explanation" refers to a detailed and sequential breakdown of the solution or reasoning behind the answer. This comprehensive explanation walks through each step of the answer, offering you clarity and understanding.
Our explanations are based on the best information we have, but they may not always be right or fit every situation.
The blue check mark means that this solution has been answered and checked by an expert. This guarantees that the final answer is accurate.
Learn more on how we answer questions.
Already have an account?

Related Answered Questions