Question 16.2: Transfer Line Performance A machine tool builder submits a p...
Transfer Line Performance
A machine tool builder submits a proposal for a 20-station transfer line to machine a certain component currently produced by conventional methods.
The proposal states that the line will operate at a production rate of 50 pc/hr at 100% efficiency. On similar transfer lines, the probability of station breakdowns per cycle is equal for all stations: p = 0.005 breakdowns/cycle. It is also estimated that the average downtime per line stop will be 8.0 min. The starting casting that is to be machined on the line costs $3.00 per part. The line operates at a cost of $75.00/hr. The 20 cutting tools (one tool per station) last for 50 parts each, and average cost per tool is $2.00 per cutting edge. Determine (a) production rate, (b) line efficiency, and (c) cost per piece produced on the line.