Question 13.2: Consider a 60-kW cogeneration system that produces electrici...

Consider a 60-kW cogeneration system that produces electricity and hot water with the following efficiencies: (a) 26 percent for the electricity generation, and (b) 83 percent for the combined heat and electricity generation. Determine the annual savings of operating the cogeneration system compared to a conventional system that consists of purchasing electricity at a rate of $0.08/kWh and producing heat from a boiler with 70 percent efficiency. The cost of fuel is $5/MMBtu. The maintenance cost of the cogeneration system is estimated at $1.00 per hour of operation. Assume that all the generated thermal energy and electricity are utilized during 6,500 hrs/year.
Determine the payback period of the cogeneration system if the installation cost is $2,500/kW.

The Blue Check Mark means that this solution has been answered and checked by an expert. This guarantees that the final answer is accurate.
Learn more on how we answer questions.

First, the cost of operating the cogeneration system is compared to that of the conventional system on an hourly basis:
(a) Cogeneration System: For each hour, 60-kW of electricity is generated (at an efficiency of 26 percent) with fuel requirements of 0.787 MMBtu [(= 60 kW * 0.003413 MMBtu/kW/0.26). At the same time, a thermal energy of 0.449 MMBtu (= 0.787 MMBtu * 0.83 – 0.26) is obtained. The hourly flow of energy for the cogeneration system is summarized in the  diagram below:

Thus, the cost of operating the cogeneration on an hourly basis can be  estimated as follows:

$3.93/hr 0.787 MMBtu/hr * $ 5/MMBtu = Fuel Cost:
$1.00/hr Maintenance Cost:
$4.93/hr Total Cost:

(b) Conventional System: For this system, the 60 kW electricity is directly purchased from the utility, and the 0.449 MMBtu of hot water is generated using a boiler with an efficiency of 0.65. Thus the costs associated with utilizing a conventional system are as follows:

$4.80/hr 60 kWh/hr * 0.08 = Electricity Cost:
$3.45/hr (0.449 MMBtu/hr)/0.65 * $ 5/MMBt Fuel Cost (Boiler):
$8.25/hr Total Cost:

Therefore, the annual savings associated with using the cogeneration system are:

ΔCost = ($8.25/hr −$4.93/hr)*6500hr/yr = $21,580/yr

Thus, the simple payback period for the cogeneration system:

SPB=\frac {\$2500/kW*60kW}{\$21,580}=7  years

A life-cycle cost analysis may be required to determine if the investment on the cogeneration system is really warranted.