Question 15.18: Greenacres’ Sewage Pumping (revisited) Calculate the PW for ...
Greenacres′ Sewage Pumping (revisited)
Calculate the PW for Example 15.17 using an equivalent discount rate.
The blue check mark means that this solution has been answered and checked by an expert. This guarantees that the final answer is accurate.
Learn more on how we answer questions.
Learn more on how we answer questions.
Now:
(1 + r ) = 1.07 · 1.05/1.03 = 1.090777
and r = 9.0777%. Since this exceeds i = 8%, we let:
(1 + x) = (1 + r)/(1 + i ) = 1.090777/1.08
and x = 0.9978%. Now:
PW = [1.25M/1.08](F/A,.9978%,10) = 1.1574 · 10.4612 = $12.11M
If we wanted to analyze the dependence of the PW on any of the four geometric rates, this equation is much easier to use than a full spreadsheet table.
Related Answered Questions
Question: 15.16
Verified Answer:
The first step is to calculate the annual payment....
Question: 15.15
Verified Answer:
This is a simplification of a typical mortgage, wh...
Question: 15.14
Verified Answer:
Since the operating costs are stated in year-0 dol...
Question: 15.11
Verified Answer:
First, the year-1 dollars of CF_{1}...
Question: 15.10
Verified Answer:
First, the year-1 dollars of CF_{1}...
Question: 15.9
Verified Answer:
First, the year-1 dollars of CF_{1}...
Question: 15.8
Verified Answer:
First, the year-1 dollars of CF_{1}...
Question: 15.7
Verified Answer:
First, the year-1 dollars of CF_{1}...
Question: 15.19
Verified Answer:
The exact calculation lets (1 + r) = 1.03/1.07; th...
Question: 15.17
Verified Answer:
The cost in year 10 occurs 9 years later than the ...