Design a channel to carry a flow of 6.91 m³ /s. The channel will be excavated through stiff clay at a channel bottom slope of 0.00318.
Given:
Q = 6.91 m³ /s;
S_{o} = 0.00318;
Channel material is clay.
Determine:
B_{o} = ?
Flow depth = ?
For stiff clay, n = 0.025, suggested side slope, s = 1 : 1 (from Table 9-2), and the permissible flow velocity (from Table 9-3) is 1.8 m/s. Hence,
\quad\quad\quad\quadA = 6.91 / 1.8 = 3.83 m²
Substituting values for V, n, and S_{o} into Manning equation, and solving for R, we get R = 0.713 m. Hence,
\quad\quad\quad\quad P=\frac{3.83}{0.713}=5.37m
\quad\quadSubstitution into expressions for P and A from Eq. 9-11 and equating them to the values computed above, we obtain
\quad\quad\quad\quad P=B_{o}+2\sqrt{1+s^{2}}y
\quad\quad\quad\quad A = (B_{o} + sy)y (9-11)
\quad\quad\quad\quad B_{o}+2.83y=5.37\\\quad\quad\quad\quad\quad(B_{o}+y)y=3.83
Elimination of B_{o} from these two equations yields
\quad\quad\quad\quad 1.83y² – 5.37y + 3.83 = 0
Solution of this equation gives y = 1.22 m. The freeboard from Eq. 9-1 may be calculated as \sqrt{0.8\times1.22} = 0.99 m, whereas the suggested value in Table 9-1 is 0.75 m. Let us select a freeboard of 0.75 m. Then, the depth of the section = 1.22 + 0.0.75 = 1.97 m. Select a depth of 2.0 m and bottom width of 1.9 m.
\quad\quad\quad\quad F_{b}=\sqrt{ky} (9-1)
Table 9-2 Suggested Side Slopes^{∗} | |
Material | Side slope |
Rock | Nearly vertical |
Stiff clay | \frac{1}{2} to 1:1 |
Firm soil | 1:1 |
Loose sandy soil | 2:1 |
Sandy loam | 3:1 |
^{∗} After Fortier and Scobey [1926] |
Table 9-3 Recommended Permissible Velocities^{∗} | |
Material | V (m/s) |
Fine sand | 0.6 |
Coarse sand | 1.2 |
Earth | |
Sandy silt | 0.6 |
Silt clay | 1.1 |
Clay | 1.8 |
Grass-lined earth (slopes < 5 per cent) Bermuda grass |
|
Sandy silt | 1.8 |
Silt clay | 2.4 |
Kentucky Blue grass | |
Sandy silt | 1.5 |
Silt clay | 2.1 |
Poor rock (usually sedimentary) | |
Soft sandstone | 2.4 |
Soft shale | 1.1 |
Good rock (usually igneous or hard metamorphic) | 6.1 |
^{∗} After U. S. Army Corps of Engineers [1970] |
Table 9-1 Suggested Freeboard^{∗} | ||||
Discharge (m^3 /s) | < 0.75 | 0.75 to 1.5 | 1.5 to 85 | > 85 |
Freeboard (m) | 0.45 | 0.60 | 0.75 | 0.90 |
^{∗} After Ranga Raju [1983] |