Question 17.3: Northern Electric Postulate and justify the limits of uncert...

Northern Electric
Postulate and justify the limits of uncertainty for an electric power-generating facility with the following six parameters:

$5M Building cost
$10M Equipment cost
$2.5M Annual net revenue
$1M Salvage value
10% i
20 years N