Holooly Plus Logo

Question 10.10: Pile loads due to shear wall loading Given the wall and pile...

Pile loads due to shear wall loading
Given the wall and pile cap configuration in Figure 10.37, determine the loading on piles due to the shear wall loads. Note that the shear wall is asymmetrical to the pile cap and the piles are not evenly spaced (Table 10.1).

Table 10.1 Location of center of gravity of pile group
Pile Area (ft²) X_i (ft) A_iX_i (ft³)
1,2 2 (0.785) = 1.57 3 4.71
3,4 1.57 8 12.56
5,6 1.57 14 21.98
7,8 1.57 19 29.83
9,10 1.57 23 36.11
7.85 105.19
fig10.37
The "Step-by-Step Explanation" refers to a detailed and sequential breakdown of the solution or reasoning behind the answer. This comprehensive explanation walks through each step of the answer, offering you clarity and understanding.
Our explanations are based on the best information we have, but they may not always be right or fit every situation.
The blue check mark means that this solution has been answered and checked by an expert. This guarantees that the final answer is accurate.
Learn more on how we answer questions.
Already have an account?

Related Answered Questions

Question: 10.7

Verified Answer:

The maximum and minimum pile load is found by cons...