Chapter 16A
Q. 16A.2
Production Rates on the Two-Stage Line of Example 16A.1
Compute the production rates for the four cases in Example 16A.1. T_{c} = 1.2 min as before.
Step-by-Step
Verified Solution
(a) For b = 0, E_{0} = 0.60. Applying Equation (16A.15),
R_{p} = \frac{E}{T_{c}}R_{p} = 0.60/1.2 = 0.5 pc/min = 30 pc/hr
This is the same value calculated in Example 16.2.
(b) For b = ∞, E_{∞} = 0.75, and R_{p} = 0.75/1.2 = 0.625 pc/min = 37.5 pc/hr
(c) For b = 10, E_{10} = 0.6875, and R_{p} = 0.6875/1.2 = 0.5729 pc/min = 34.375 pc/h