Question 12.p.5: ROP for constant demand and variable lead time. The motel in...
ROP for constant demand and variable lead time. The motel in the preceding example uses approximately 600 bottles of water each day, and this tends to be fairly constant. Lead time for water delivery is normally distributed with a mean of six days and a standard deviation of two days. A service level of 90 percent is desired.
a. Find the ROP.
b. How many days of supply are on hand at the ROP?
The blue check mark means that this solution has been answered and checked by an expert. This guarantees that the final answer is accurate.
Learn more on how we answer questions.
Learn more on how we answer questions.
d = 600 bottles per day
SL = 90 percent, so z = +1.28 ( from Appendix B, Table B2 )
\overline{LT} = 6 days
σ_{LT} = 2 days
a. ROP = d \overline{LT} + z ( σ_{LT} ) d = 600 ( 6 ) + 1.28 ( 2 ) ( 600 )
= 5,136 bottles of water
b. \frac{ROP}{d}=\frac{5,136}{600}=8.56 days

Related Answered Questions
Question: 12.11
Verified Answer:
a. For the risk of stockout for the first lead tim...
Question: 12.13
Verified Answer:
SL = SL = \frac{C_s}{C_s + C_e}=\frac{\$2.4...
Question: 12.15
Verified Answer:
C_s = $3 C_e = ...
Question: 12.p.4
Verified Answer:
\overline{d} = 400 bars of soap pe...
Question: 12.p.6
Verified Answer:
\overline{d} = 25 glasses per day ...
Question: 12.p.8
Verified Answer:
C_s is unknown C_e =...
Question: 12.8
Verified Answer:
Expected lead time demand = 50 tons
σ_{dLT}...
Question: 12.9
Verified Answer:
\overline{d} = 50 jars per week ...
Question: 12.p.7
Verified Answer:
\overline{d} = 15.2 ml per day ...
Question: 12.p.3
Verified Answer:
a. Compute the EOQ for $2 per pound. The quantity ...