Question 4.15: What is the internal rate of return of the Chaotic Industrie...
What is the internal rate of return of the Chaotic Industries project from Activity 4.2? (Hint: Remember that you already know the NPV of this project at 15 per cent (from Activity 4.12).)
The blue check mark means that this solution has been answered and checked by an expert. This guarantees that the final answer is accurate.
Learn more on how we answer questions.
Learn more on how we answer questions.
Since we know that, at a 15 per cent discount rate, the NPV is a relatively large negative figure, our next trial is using a lower discount rate, say 10 per cent:
Time | Cash flows £000 |
Discount factor 10% |
Present value £000 |
Immediately | (150) | 1.000 | (150.00) |
1 year’s time | 30 | 0.909 | 27.27 |
2 year’s time | 30 | 0.826 | 24.78 |
3 year’s time | 30 | 0.751 | 22.53 |
4 year’s time | 30 | 0.683 | 20.49 |
5 year’s time | 30 | 0.621 | 18.63 |
6 year’s time | 30 | 0.564 | 16.92 |
6 year’s time | 30 | 0.564 | \underline{16.92} |
NPV \underline{(2.46)} |
This figure is close to zero NPV. However, the NPV is still negative and so the precise IRR will be a little below 10 per cent.
Related Answered Questions
Question: 4.A.17
Verified Answer:
The minimum price is the amount required to cover ...
Question: 6.14
Verified Answer:
The current cost of trade credit is:
£
Bad ...
Question: 4.SE.5
Verified Answer:
Newton Electronics Ltd
(a) Opt...
Question: 4.SE.6
Verified Answer:
Chesterfield Wanderers
(a)
Player option
Yea...
Question: 4.SE.1
Verified Answer:
Mylo Ltd
(a) The annual depreci...
Question: 4.5
Verified Answer:
The inflows and outflows are expected to be:
T...
Question: 4.6
Verified Answer:
The PP for each project is three years and so the ...
Question: 4.18
Verified Answer:
Your answer should be as follows:
(a) [...
Question: 4.2
Verified Answer:
The vans will save the business £30,000 a year (th...
Question: 4.12
Verified Answer:
Remember that the inflows and outflow are expected...