Question 7.2: A recently completed fill was 32.8 ft thick and its initial ...

A recently completed fill was 32.8 ft thick and its initial average void ratio was 1.0. The fill was loaded on the surface by constructing an embankment covering a large area of the fill. Some months after the embankment was constructed, measurements of the fill indicated an average void ratio of 0.8. Estimate the compression of the fill.

The Blue Check Mark means that this solution has been answered and checked by an expert. This guarantees that the final answer is accurate.
Learn more on how we answer questions.

Per Eq. (7.7), the compression of the fill may be calculated as

 

\Delta H=H \frac{\Delta e}{1+e_{0}} (7.7)

 

\Delta H=\frac{\Delta e}{1+e_{0}} H_{0}

 

where \Delta H= the compression, \Delta e= change in void ratio, e_{0}= initial void ratio, H_{0}= thickness of fill.

 

Substituting, \Delta H=\frac{1.0-0.8}{1+1.0} \times 32.8=3.28 \mathrm{ft}