A window upgrade is considered for an apartment building from double-pane metal frame windows (UE = 4.61 W/m^{2}.°C) to double-pane with low-e film and wood frame windows (UR = 2.02 W/m^{2}.°C). The total window area to be retrofitted is 200 m^{2}. The building is located in Nantes (France) and is conditioned 24 hours/day, 7 days/week throughout the heating season. An electric baseboard provides heating and a window AC provides cooling (EER = 8.0).Assume that the cost of electricity is $0.10/kWh.