For the supercritical plant in Example 6-8, suppose that the CO_2 from 15 such plants is piped to a saline aquifer where it is injected. The aquifer is approximately 1000 km long and 500 km wide, with an average depth of 1000 m. All of the aquifer’s volume is available for dissolution of CO_2, and the porosity is 10%. The pressure in the aquifer is 500 kPa on average, and the temperature is 325 K. (a) If the plants function for 75 years, is there sufficient capacity in the aquifer to sequester all the CO_2 generated? (b) If the total cost per tonne CO_2 sequestered, including repayment of capital cost and all operating costs, is $25/tonne, by what percent does the cost of electricity increase?