In this example, the load trace will involve the framing for a small deck addition to a residence. Once post reactions have been determined, a preliminary footing size will be designed assuming the soil capacity of 3,000 psf is known from a geotechnical investigation.

Loads:

Live Load                                               =60 \# /ft.^{2}

Dead Loads:

Decking                                                  = 5 \# /ft.^{2}

Beams                                                     = 5 \# /ft.

Girder                                                     = 10 \# /ft.

\gamma_{concrete}  = 150\# /ft.^{3}     (density)

For this load-trace problem, we will investigate the following:

1. Draw an FBD  of the typical beam with its load condition shown.

2. Draw an FBD  of the girder with its load conditions shown.

3. Determine the load in each post.

4. Determine the size x of the critical pier footing
(account for the weight of the concrete).

The "Step-by-Step Explanation" refers to a detailed and sequential breakdown of the solution or reasoning behind the answer. This comprehensive explanation walks through each step of the answer, offering you clarity and understanding.
Our explanations are based on the best information we have, but they may not always be right or fit every situation.
The Blue Check Mark means that this solution has been answered and checked by an expert. This guarantees that the final answer is accurate.
Learn more on how we answer questions.

Related Answered Questions