In this example, the load trace will involve the framing for a small deck addition to a residence. Once post reactions have been determined, a preliminary footing size will be designed assuming the soil capacity of 3,000 psf is known from a geotechnical investigation.
Loads:
Live Load =60 \# /ft.^{2}
Dead Loads:
Decking = 5 \# /ft.^{2}
Beams = 5 \# /ft.
Girder = 10 \# /ft.
\gamma_{concrete} = 150\# /ft.^{3} (density)
For this load-trace problem, we will investigate the following:
1. Draw an FBD of the typical beam with its load condition shown.
2. Draw an FBD of the girder with its load conditions shown.
3. Determine the load in each post.
4. Determine the size x of the critical pier footing
(account for the weight of the concrete).