Operations Management
Operations Management
195 SOLVED PROBLEMS
Question: 5.p.4
A manager must decide which type of equipment to buy, Type A or Type B. Type A equipment costs $15,000 each, and Type B costs $11,000 each. The equipment can be operated 8 hours a day, 250 days a year. Either machine can be used to perform two types of chemical analysis, C1 and C2. Annual service ...
Verified Answer:
Total processing time (Annual volume × Processing ...
Question: 12.SP.2
Material Requirements Plan Setup Guide Twelve units of the end item are needed at the beginning of week 6. Prepare a material requirements plan for component D given that there is a scheduled receipt of 10 units of subassembly A in week 3 plus the following information. ...
Verified Answer:
Question: Appendix.C.4
Find the area under the curve that is outside of two standard deviations from the mean. ...
Verified Answer:
What the problem is asking for: Appendix B Table ...
Question: 19.SP.1
A small construction firm specializes in building and selling single-family homes. The firm offers two basic types of houses, model A and model B. Model A houses require 4,000 labor hours, 2 tons of stone, and 2,000 board feet of lumber. Model B houses require 10,000 labor hours, 3 tons of stone, ...
Verified Answer:
1. Formulate the objective function and constraint...
Question: 17.SP.3
A path in a network has three activities. Their standard deviations are 1.50, 0.80, and 1.30. Find the path standard deviation. ...
Verified Answer:
Standard deviations cannot be added, but variances...
Question: 16.SP.3
Priority rules. Using the job times and due dates from Solved Problem 2, determine each of the following performance measures for first-come, first-served processing order: Assume jobs listed in order of arrival. a. Makespan b. Average flow time c. Average tardiness d. Average number of jobs at the ...
Verified Answer:
Job Job Time Flow Time Hour Due Hours Tardy a 12...
Question: 16.SP.1
The assignment method. The following table contains information on the cost to run three jobs on four available machines. Determine an assignment plan that will minimize costs. ...
Verified Answer:
In order for us to be able to use the assignment m...
Question: 16.2
Determining Job Sequences Using Various Rules Processing times (including setup times) and due dates for six jobs waiting to be processed at a work center are given in the following table. Determine the sequence of jobs, the average flow time, average tardiness, and average number of jobs at the ...
Verified Answer:
a. The FCFS sequence is simply A-B-C-D-E-F. The me...
Question: 16.1
Using the Assignment Method to Make Job Assignments Determine the optimum assignment of jobs to workers for the following data (from Table 16.1): ...
Verified Answer:
a. Subtract the smallest number in each row from e...
Question: 14S.1
Comparing the Costs of Preventive Maintenance and Breakdown Maintenance The frequency of breakdown of a machine per month is shown in the table. The cost of a breakdown is $1,000 and the cost of preventive maintenance is $1,250 per month. If preventive maintenance is performed, the probability of a ...
Verified Answer:
The expected number of breakdowns without preventi...