Question 16.SP.2: Priority rules. Job times (including processing and setup) a...
Priority rules. Job times (including processing and setup) are shown in the following table for five jobs waiting to be processed at a work center.
Job | Job Time (hours) | Due Date (hours) |
a | 12 | 15 |
b | 6 | 24 |
c | 14 | 20 |
d | 3 | 8 |
e | 7 | 6 |
Determine the processing sequence that would result from each of these priority rules:
a. SPT b. EDD
The blue check mark means that this solution has been answered and checked by an expert. This guarantees that the final answer is accurate.
Learn more on how we answer questions.
Learn more on how we answer questions.
Assume job times are independent of processing sequence.
a. SPT | b. EDD | |||
Job | Job Time |
Processing Order |
Hour Due |
Processing Order |
a | 12 | 4 | 15 | 3 |
b | 6 | 2 | 24 | 5 |
c | 14 | 5 | 20 | 4 |
d | 3 | 1 | 8 | 2 |
e | 7 | 3 | 6 | 1 |
Related Answered Questions
Question: 16.SP.3
Verified Answer:
Job
Job
Time
Flow
Time
Hour
Due
Hours
Tardy
a
12...
Question: 16.SP.1
Verified Answer:
In order for us to be able to use the assignment m...
Question: 16.2
Verified Answer:
a. The FCFS sequence is simply A-B-C-D-E-F. The me...
Question: 16.1
Verified Answer:
a. Subtract the smallest number in each row from e...
Question: 16.SP.6
Verified Answer:
We assume that the processing sequence remains unc...
Question: 16.SP.5
Verified Answer:
a. Identify the smallest time: job b (1.50 hours a...
Question: 16.SP.4
Verified Answer:
Assume times are independent of processing sequenc...
Question: 16.4
Verified Answer:
a. Select the job with the shortest processing tim...
Question: 16.3
Verified Answer:
Determine the difference between the due date and ...