Question 16.SP.4: S/O rule. Using the following information, determine an orde...
S/O rule. Using the following information, determine an order processing sequence using the S/O priority rule.
Order | Processing Time Remaining (days) |
Due Date (days) |
Number of Operations Remaining |
A | 20 | 30 | 2 |
B | 11 | 18 | 5 |
C | 10 | 6 | 2 |
D | 16 | 23 | 4 |
The blue check mark means that this solution has been answered and checked by an expert. This guarantees that the final answer is accurate.
Learn more on how we answer questions.
Learn more on how we answer questions.
Assume times are independent of processing sequence.
Order | (1) Remaining Processing Time |
(2)
Due Date |
(3)
(2) − (1) |
(4)
Number of |
(5)
Ratio |
(6)
Rank |
A | 20 | 30 | 10 | 2 | 5.00 | 4 |
B | 11 | 18 | 7 | 5 | 1.40 | 2 |
C | 10 | 6 | −4 | 2 | −2.00 | 1 |
D | 16 | 23 | 7 | 4 | 1.75 | 3 |
(Note that one ratio is negative. When negatives occur, assign the lowest rank to the most negative number.)
Related Answered Questions
Question: 16.SP.3
Verified Answer:
Job
Job
Time
Flow
Time
Hour
Due
Hours
Tardy
a
12...
Question: 16.SP.1
Verified Answer:
In order for us to be able to use the assignment m...
Question: 16.2
Verified Answer:
a. The FCFS sequence is simply A-B-C-D-E-F. The me...
Question: 16.1
Verified Answer:
a. Subtract the smallest number in each row from e...
Question: 16.SP.6
Verified Answer:
We assume that the processing sequence remains unc...
Question: 16.SP.5
Verified Answer:
a. Identify the smallest time: job b (1.50 hours a...
Question: 16.SP.2
Verified Answer:
Assume job times are independent of processing seq...
Question: 16.4
Verified Answer:
a. Select the job with the shortest processing tim...
Question: 16.3
Verified Answer:
Determine the difference between the due date and ...