Question 16.3: Scheduling Jobs Using the S/O Rule Use the S/O rule to sched...
Scheduling Jobs Using the S/O Rule
Use the S/O rule to schedule the following jobs. Note that processing time includes the time remaining for the current and subsequent operations. In addition, you will need to know the number of operations remaining, including the current one.
Job | Remaining Processing Time |
Due Date |
Remaining Number of Operations |
A | 4 | 14 | 3 |
B | 16 | 32 | 6 |
C | 8 | 8 | 5 |
D | 20 | 34 | 2 |
E | 10 | 30 | 4 |
F | 18 | 30 | 2 |
The blue check mark means that this solution has been answered and checked by an expert. This guarantees that the final answer is accurate.
Learn more on how we answer questions.
Learn more on how we answer questions.
Determine the difference between the due date and the processing time for each operation. Divide the difference by the number of remaining operations, and rank them from low to high. This yields the sequence of jobs:
Job |
(1) Remaining Processing Time |
(2)
Due |
(3)
(2) − (1) |
(4) Remaining Number of Operations |
(5)
(3) ÷ (4) |
(6)
Rank |
A | 4 | 14 | 10 | 3 | 3.33 | 3 |
B | 16 | 32 | 16 | 6 | 2.67 | 2 |
C | 8 | 8 | 0 | 5 | 0 | 1 |
D | 20 | 34 | 14 | 2 | 7.00 | 6 |
E | 10 | 30 | 20 | 4 | 5.00 | 4 |
F | 18 | 30 | 12 | 2 | 6.00 | 5 |
The indicated sequence (see column 6) is C-B-A-E-F-D.
Related Answered Questions
Question: 16.SP.3
Verified Answer:
Job
Job
Time
Flow
Time
Hour
Due
Hours
Tardy
a
12...
Question: 16.SP.1
Verified Answer:
In order for us to be able to use the assignment m...
Question: 16.2
Verified Answer:
a. The FCFS sequence is simply A-B-C-D-E-F. The me...
Question: 16.1
Verified Answer:
a. Subtract the smallest number in each row from e...
Question: 16.SP.6
Verified Answer:
We assume that the processing sequence remains unc...
Question: 16.SP.5
Verified Answer:
a. Identify the smallest time: job b (1.50 hours a...
Question: 16.SP.4
Verified Answer:
Assume times are independent of processing sequenc...
Question: 16.SP.2
Verified Answer:
Assume job times are independent of processing seq...
Question: 16.4
Verified Answer:
a. Select the job with the shortest processing tim...