A 6 ft diameter, 2000 ft long sewer drain pipe is to be installed 24 ft below the ground surface as shown in Figure 8.6. To build this pipe, a long trench must be excavated below the groundwater table as shown. Steel sheet piles (heavy, corrugated sheets of steel) will be installed to keep the sides from collapsing, and the trench will be dewatered with pumps. After the pipeline is installed, the pumps will be removed, the trench will be backfilled, and the sheet piles will be removed.

The dewatering pumps will be placed at 100 ft intervals along the trench. Assuming the sheet piles are perfectly watertight (probably not a good assumption!), draw a flow net and compute the Q for each pump.

The "Step-by-Step Explanation" refers to a detailed and sequential breakdown of the solution or reasoning behind the answer. This comprehensive explanation walks through each step of the answer, offering you clarity and understanding.
Our explanations are based on the best information we have, but they may not always be right or fit every situation.
The Blue Check Mark means that this solution has been answered and checked by an expert. This guarantees that the final answer is accurate.