A pumped well and two observation wells have been installed through a fine-to-medium sand as shown in Figure 8.23. A pump has been discharging water from the pumped well for a sufficient time to achieve steady-state conditions. The water levels in observation wells A and B were then observed to be 20 and 35 ft below the ground surface, respectively. Compute the hydraulic conductivity of the aquifer.