Question 7.3: Computing a Time Standard A time study of an assembly operat...
Computing a Time Standard
A time study of an assembly operation yielded the following observed times for one element of the job, for which the analyst gave a performance rating of 1.13. Using an allowance of 20 percent of job time, determine the appropriate standard time for this operation.
i Observation |
Time, x (minutes) |
i Observation |
Time, x (minutes) |
1 | 1.12 | 6 | 1.18 |
2 | 1.15 | 7 | 1.14 |
3 | 1.16 | 8 | 1.14 |
4 | 1.12 | 9 | 1.19 |
5 | 1.15 | Total 10.35 |
n = 9 PR = 1.13 A = .20
The "Step-by-Step Explanation" refers to a detailed and sequential breakdown of the solution or reasoning behind the answer. This comprehensive explanation walks through each step of the answer, offering you clarity and understanding.
Our explanations are based on the best information we have, but they may not always be right or fit every situation.
Our explanations are based on the best information we have, but they may not always be right or fit every situation.
The blue check mark means that this solution has been answered and checked by an expert. This guarantees that the final answer is accurate.
Learn more on how we answer questions.
Learn more on how we answer questions.
Related Answered Questions
Question: 7.SP.4
Verified Answer:
Step 1: Find the mean of the data.
Step 2: Subtrac...
Question: 7.SP.3
Verified Answer:
e = z \sqrt{\frac{\hat{p}(1 - \hat{p})}{n...
Question: 7.SP.2
Verified Answer:
a. A maximum error of ± 6 percent of the sample me...
Question: 7.SP.1
Verified Answer:
OT = Average time = 18.75 minutes
NT = OT × Perfo...
Question: 7.4
Verified Answer:
z = 2.33, e = .05, \hat{p} is unkno...
Question: 7.2
Verified Answer:
A = .20
a. AF = 1 + A = 1.20, or 120%
AF = ...
Question: 7.1
Verified Answer:
a. \begin{aligned} s = 2.1 minutes ...