Question 7.SP.3: Work sampling. An analyst has been asked to prepare an estim...
Work sampling. An analyst has been asked to prepare an estimate of the proportion of time that a turret lathe operator spends adjusting the machine, with a 90 percent confidence level. Based on previous experience, the analyst believes the proportion will be approximately 30 percent.
a. If the analyst uses a sample size of 400 observations, what is the maximum possible error that will be associated with the estimate?
b. What sample size would the analyst need in order to have the maximum error be no more than ± 5 percent?
\hat{p} = .30 z = 1.65 for 90 percent confidence from p. 307
The "Step-by-Step Explanation" refers to a detailed and sequential breakdown of the solution or reasoning behind the answer. This comprehensive explanation walks through each step of the answer, offering you clarity and understanding.
Our explanations are based on the best information we have, but they may not always be right or fit every situation.
Our explanations are based on the best information we have, but they may not always be right or fit every situation.
The blue check mark means that this solution has been answered and checked by an expert. This guarantees that the final answer is accurate.
Learn more on how we answer questions.
Learn more on how we answer questions.
Related Answered Questions
Question: 7.SP.4
Verified Answer:
Step 1: Find the mean of the data.
Step 2: Subtrac...
Question: 7.3
Verified Answer:
1. OT = \frac{\sum{x_{i}}}{n} = \frac{10.35...
Question: 7.SP.2
Verified Answer:
a. A maximum error of ± 6 percent of the sample me...
Question: 7.SP.1
Verified Answer:
OT = Average time = 18.75 minutes
NT = OT × Perfo...
Question: 7.4
Verified Answer:
z = 2.33, e = .05, \hat{p} is unkno...
Question: 7.2
Verified Answer:
A = .20
a. AF = 1 + A = 1.20, or 120%
AF = ...
Question: 7.1
Verified Answer:
a. \begin{aligned} s = 2.1 minutes ...